INVERTER OUTPUT [AC]
Rated AC Output and UPS Power | 5000W |
Max. AC Power | 5500W |
Peak Power (off-grid) | 2 times of rated power, 10 S |
AC Output Rated Current | 21.7A |
Max AC Output Current | 25A |
Max Continuous AC Passthrough | 35A |
Output Frequency and Voltage | 50/60Hz; 220/230/240Vac (single phase) |
Grid Type | Single Phase |
Current Harmonic Distortion | THD<3%(Linear load<1.5%) |
PV STRING INPUT
Max. DC Input Power | 6500W |
PV Input Voltage | 370V (100V~500V) |
MPPT Range | 125~425V |
Start-up Voltage | 150V |
PV Input Current | 11A+11A |
No. of MPPT Trackers | 2 |
No. of Strings Per MPPT Tracker | 1+1 |
EFFICIENCY
Max. Efficiency | 97.60% |
MPPT Efficiency | 96.50% |
Euro Efficiency | 99.90% |
BATTERY INPUT
Battery Type | Lead-acid or Lithium-ion |
Battery Voltage Range | 40~60V |
Max. Charging Current | 120A |
Max. Discharging Current | 120A |
Charging Curve | 3 Stages/Equalisation |
External Temperature Sensor | Optional |
Charging Strategy for Li-Ion Battery | Self-Adaptation to BMS |
GENERAL
Operating Temperature Range | -25~60°C, >45°C Derating |
Cooling | Fan |
Noise | <30dB |
Communication with BMS | RS485; CAN |
Weight | 20.5 kg |
Dimensions (LxWxH) | 580 x 330 x 208 mm |
Protection Degree | IP65 |
Installation Style | Wall-mounted |
Warranty | 5 years |
CERTIFICATION & STANDARDS
Grid Regulation | VDE 0126, AS4777, NRS2017, G98, G99, IEC61683, IEC62116, IEC61727, RD1699:2011, XP C15-712-3:2019-05 |
Safety Regulation | IEC62109-1, IEC62109-2 |
EMC | EN61000-6-1, EN61000-6-3 |
USER MANUALS & GUIDES
FAQ
Does the price include installation?
No, the price doesn't include installation. Installations are all different and require varying length of cable, time and distances to be travelled. In addition to this installations need to be done by a qualified electrician to issue a valid Certificate of Compliance (COC) for your insurance.
Do we offer installation?
YES! We have our own solar installation teams (Gauteng only). More information available here. (CLICK).
Does the price include delivery?
All prices exclude delivery. We will quote on a case-by-case basis for delivery to ensure you get the best value.
Do I need anything else to connect the solar panels?
Solar installations are a specialised trade. There are a multitude of additional connectors and mounting systems required in order to get your installation working optimally.
Tell me about the Warranty?
The warranty is 5 years. It is a limited warranty. Travel to site is not included in the warranty. The goods need to be returned to us or a call out will be charged. Please refer to the Terms and Conditions of sale and the Warranty Card for further information on the warranty. Warranty is held with the agency where you bought the products. If you have purchased your products in Johannesburg then the warranty is held in Johannesburg etc.
Price Validity
Pricing is valid whilst stock lasts and is subject to change without prior notice. Pricing on the website is indicative and should always be confirmed by Bundu Power in the form of a written quotation.